The Snidal manual has a good description of the basic right foot shift installation for the 4-speed box. However, it lacks the information on adding spacers(washers) to bell crank shaft to get the correct lash for the bell crank. Another source of infomation for the 4-speed box is the Hitchock's tech board.
http://www.hitchcocksmotorcycles.com/technical-notes. In the technical notes, click on "Gearbox and Clutch", then look at "Albion Gearbox Rebuild Parts 3,4,5".
The parts you will need are 1)Bell crank, 2)New inner cover, 3)Bell crack bush,4)Inner shifter lever,5)Right foot shift lever,6)Gaskets, inner cover, kickstart shaft gaskets, 7)Sealed Main shaft bearing (optional, '98 was unsealed),8)New rear brake lever (left foot, I seem to remember a new brake shaft bushing was also needed for this lever). On my kit, the opening for the kick start shaft in the new outer cover needed some additional machining as it was too tight for the kick shaft.
HooHoobolin has a video of his installation at :
https://www.bing.com/videos/search?q=ro ... &FORM=VIRE